AfterSample drawingBeforeSample drawing
Concrete
Two-car driveway, torn out and replaced
Sonoma Ranch · May 2026
- Size
- 640 sq ft
- Took
- 3 days
The old driveway had sunk at the garage and cracked across. We broke it out, compacted new base course, tied a rebar grid on chairs and poured a 5-inch slab with a broom finish.
-
Sample drawing
Decks & covers
Composite deck with railing and stairs
Picacho Hills · April 2026
- Size
- 320 sq ft
- Took
- 5 days
A raised deck off the back door, on concrete footings, in composite boards that won't need sanding or sealing. Railing all the way around and stairs down to the yard.
-
Sample drawing
Decks & covers
Steel patio cover with a metal roof
Mesilla · March 2026
- Size
- 400 sq ft
- Took
- 4 days
Shade over the whole back patio: steel posts on footings, a steel frame, and a ribbed metal roof that reflects the afternoon sun. Two fans wired to a switch inside.
-
Sample drawing
Additions
Casita addition with its own bath
University District · November 2025
- Size
- 420 sq ft
- Took
- 11 weeks
A one-room casita for visiting family: footings, slab, framing, roof, stucco, a full bathroom and a mini-split. Every inspection passed the first time.
-
Sample drawing
Remodels
Kitchen remodel
Las Cruces · September 2025
- Size
- 180 sq ft
- Took
- 5 weeks
A wall moved, new cabinets to the ceiling, quartz counters and a window over the sink. The family kept cooking on a temporary counter in the dining room the whole time.
-
Sample drawing
Remodels
Bathroom remodel
Organ · August 2025
- Size
- 90 sq ft
- Took
- 3 weeks
Tub out, new tub in, tile floor to ceiling, and the soft subfloor under the old toilet replaced before anything went back on top of it.